2014 Projects

We have extensive experience in the development of turnkey projects, conduction of basic and detailed engineering, installation, commissioning, and maintenance of industrial automation projects.

Revamping Welding Drums

  • Given the repeated errors submitted ​​by the control panel, was carried out the change of the PLC, display and weld controller. With this was achieved significantly lower defective drums and line speed was increased in 16 %.


Revamping AGVs boards

  • Given the lack of spare parts of electronic contol, the AGV control was totally replaced by a PLC, a display and automated guided tailor-made conditioning modules.

Scada Tower classification

  • The programming of the new SCADA was made for Monsanto tower seed classification.

Revamping drums blower

  • Due to repeated errors in the old Siemens S5 PLC, it was replace by S7-300 PLC.

Aspiration system

  • To include the new aspiration system in the Monsanto tower classification, were reprogrammed three PLC, an HMI screen as well as the modification of the existing Scada.