We have extensive experience in the development of turnkey projects, conduction of basic and detailed engineering, installation, commissioning, and maintenance of industrial automation projects.
Revamping Welding Drums
- Given the repeated errors submitted by the control panel, was carried out the change of the PLC, display and weld controller. With this was achieved significantly lower defective drums and line speed was increased in 16 %.
- Engineering and assembling of the panel.
- Welding controller settings.
- Installation and commissioning.
Revamping AGVs boards
- Given the lack of spare parts of electronic contol, the AGV control was totally replaced by a PLC, a display and automated guided tailor-made conditioning modules.
- Basic and detailed engineering.
- Design, development and electronics manufacturing for the conditioning of the antennas.
- Reengineering Communication Protocol Traffic Controller.
- Installation and Commissioning.
- Altium Designer (circuits and platelets design)
- Freescale Code Warrior (Motorola microcontrollers)
Scada Tower classification
- The programming of the new SCADA was made for Monsanto tower seed classification.
- Logic study of the tower PLCs.
- Study of the SCADA Intouch Real Wonderwoare.
- Programming of Scada WinCC 7.2.
- Scada Wonderware Intouch V10.1
Revamping drums blower
- Due to repeated errors in the old Siemens S5 PLC, it was replace by S7-300 PLC.
- Engineering and assembling of the panel.
- PLC, HMI and Servodrives programming.
- Installation and Commissioning.
- S5 115U PLC replacement for S7-300
Aspiration system
- To include the new aspiration system in the Monsanto tower classification, were reprogrammed three PLC, an HMI screen as well as the modification of the existing Scada.
- Installation and Commissioning.
- Altivar 71 y Altivar 61 Drives
- Scada Wonderware Intouch V10.1