2015 Projects

We have extensive experience in the development of turnkey projects, conduction of basic and detailed engineering, installation, commissioning, and maintenance of industrial automation projects.

Flow calibration suitcase V2

  • This tailormade development was conducted in order to calibrate combustible flowmeters filling in trucks suppliers. For the same purpose, electronic measurement and pulse synchronization between master and service meter was developed. The application that serves as HMI interface and that stores, in the database of computer, data stations, terminals, product type and other information associated with the calculation of a specific calibration factor was also implemented.


Turbine Meter Tester

  • This development took place to test all parts of the turbine flow meter, so the equipment can measure the signal from the pickup, the preamp output and the input to flow controller.